|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
 |
|
|
 |
|
|
|
|
|
Completeness of the scope of services offered in the area of building
management by Domia art s. r. o. Company.
|
|
 |
|
 |
|
Field of Services Provided: |
|
 |
|
- Consulting and appraisal activities
- Tenders, reviewing the bids submitted and advisory service in the field of awarding public contracts
- Studies, master plans, sketch plans and detailed project documentation
|
|
 |
|
|
- project documentation for land decision application
- project documentation for building permit application
- working drawings project documentation
|
|
|
|
 |
|
|
 |
|
- EIA documentation on impact of buildings and of technology on environment
- Special structural and mechanical calculations
- Operational and manipulation rules
- Financial projects
- Engineering and complete construction management
- Managing construction sites and building supervision
- Commissioning of buildings and their test operation
- “Turn-key” projects
|
|
|
|
- Buildings |
- Flats and apartment buildings
- Apartments and social welfare flats
- Houses and villas
- Office blocks
- Medical facilities and hospitals
- Theatres and cinemas
- Entertainment centres
- Supermarkets
- Logistics sites
|
|
|
|
- Industrial buildings
- Civil constructions
- Reconstruction
- Real Estate
|
|
|
Project Documentation for Building Construction and Engineering: |
|
In co-operation with our client, who we regard as our business partner, we endeavour to establish the core of the customer’s needs and requirements from the initial studies through working drawing documentation stage, all the way up to actual commissioning of the building for its permanent use. |
|
- Consulting and assessment activities
- Studies, master plans and architectural design of buildings,
|
|
|
- Engeneering activities
|
- Building site analysis,
- Specification of necessary materials and surveys
- Analysis of materials: for example, energies, structure, and technologies, etc.
- Verification of basic target ideas with customer
- Preparation of alternative conceptual solutions, studies, and sketches
- Involvement of additional professions
- Clarification of all linkages (town planning, function, technical)
- Negotiations with all relevant public bodies and organisations
- Preliminary estimate of building costs
- Final analysis of investment intention
|
|
 |
|
- EIA documentation – Assessment of impact of building construction on environment |
|
|
|
Securing the issuing of Lawful Decision on site location |
|
|
- Preparation of documentation necessary for issuing of Land Decision,
- Securing of surveys needed for preparation of documentation
- Obtaining materials required for localisation of the site
- Preparation of a measuring concept
- Preparation of basic documents and drawings to be attached with the proposal for issuing of Decision on location of the site
- Preparation of materials submitted for Land Proceedings
- Obtaining documents and standpoints of public administration bodies and organisations necessary for issuing of Land Decision
- Preparation and submission of proposal for commencement of proceeding for location of the site
- Obtaining of lawful Decision on location of the site.
|
|
Securing the issuing of Lawful Building Permit |
|
|
|
- Setting up conditions for maintaining compliance with pre-project stages such as lawful Decision on location of the site and impact on environment EIA,
- Preparation of drawing documentation accompanying the application for issuing of a Building Permit
- Preparation of materials submitted for Building Proceedings
- Obtaining documents and statements of public administration bodies and organisations necessary for issuing of a Building Permit
- Preparation and submission of proposal for commencement of Building Proceeding
- Obtaining of a lawful Building Permit
|
|
Project documentation for selecting of a contractor |
|
|
- Preparation of materials necessary for Tender proceedings
|
|
|
Preparation of documentation for construction of the building |
|
|
- Obtaining of materials from prospective contractors
|
|
|
– Bill of Quantities
– Budget
– Co-operation during the process of awarding the contract to a contractor:
|
|
|
- Co-operation in collection and evaluation of bids submitted
- Preparation of materials needed for signing of a Construction Contract
|
|
|
- Co-operation during construction stage:
|
|
|
- Author’s supervision by architect
- Technical supervision of investor
|
|
|
- Co-operation during completion stage:
|
|
|
- Co-operation during final building Approbation Proceedings,
- Supervision over removal of faults found during final Building Approbation
- Co-operation at final account of the contract budget
|
|
|
|
|
|
|
|
Construction Management
|
|
|
|
|
|
This is a complete set of services for clients, who require full control over construction development into which they invest their money. It concerns in particular the following partial services: |
|
- Proposal of organisational structure and development program including allocation of competencies to individual participants to the proposed development
- Drafting and continual updating of Time Schedule for preparation and realisation of the proposed construction development, which includes milestones for preparation of project documentation for securing of relevant permits and deadlines for completion, etc.
- Continual supervision over project documentation being prepared and its co-ordination in line with client’s instructions
- Compilation of the proposed construction development budget and system of costs control
- Securing of documentation to be used for selection of a building contractor and organisation of Tender proceedings
- Preparation of a draft of Construction Contract to be concluded between the selected contractor and the client including necessary annexes – Contracts for Work
- Management of construction development in line with Construction Contract – Contract for Work
- Quality management and quality supervision according to prepared Inspection and Test Plan
- Organising of handing over construction work, collecting of certificates, accompanying technical documentation and other documents required for Building Approbation and securing the Approbation
- Taking over the completed building from the contractor and handing it over to the client including all documents, technical documentation, and operational rules, etc.
- Lodging of possible claims on behalf of the client against building contractors
|
|
|
|
Specialised Areas of Expertise |
|
As the part of construction management services Domia art s.r.o. Company also provides, for example, services in the areas listed below: |
|
|
- Town-planning studies
- Architectural studies
- Interior planning and design
- Site works and landscaping
- Materials required for town-planning
- Environmental engineering (EIA)
- Building structures and special structural details
- Structural design of concrete, steel and wooden structures
- Bill of quantities
- Budgets and estimations
- Fire protection of buildings
- Anti-radon measures
|
|
|
• Civil engineering works |
|
|
|
|
|
|
|
- Water supply systems
- Drainage
- Gas-lines
- Waste water treatment - sewerage
- Water purification, water supply
- Transfer pump stations
- Automatic pressure stations
- Outlet structures
|
|
• Specialised professions |
|
|
|
|
- ZTI – water and drainage
- Gas installations
- Energies and heat generating systems
- Heating and boiler rooms
- Cooling
- Ventilation and air-conditioning
- Electrical installation
- Low current distribution
- Measuring and regulation
- Data installation
- Water treatment
- Piping distribution networks
- Compressor stations
- Logistics
- Catering technology
|
|
Services Provided in the Area of Real Estate |
|
|
|
- Feasibility studies – land or building utilisation, alternative evaluation of future costs, values and risks
- Survey of technical state of existing buildings and their evaluation
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|